Your daily news service from ports around the world.
In this HOT PORT NEWS, read about:
* Singapore, Singapore – Reclamation of Ayer Chawan Basin, Jurong Island
* Australia, Port Hedland – New Port Improvement Rate to be introduced
* Bunker Update – MARKET PRICE UPDATE 13/06/13
DATE: June 13, 2013
COUNTRY: Singapore
PORT: Singapore
Reclamation of Ayer Chawan Basin, Jurong Island
Reclamation works will be carried out in the vicinity of Ayer Chawan Basin,
Jurong Channel from 15 June to 14 December.
According to the Maritime and Port Authority of Singapore Port Marine
Notice No.77 of 2013, the works will be conducted 24 hours daily –
including Sundays & Public Holidays – within the working area bounded by
the following coordinates (WGS 84 Datum):
A 1° 17.382’N / 103° 42.194’E
B 1° 17.235’N / 103° 42.363’E
C 1° 17.127’N / 103° 42.436’E
D 1° 17.068’N / 103° 42.368’E
E 1° 16.957’N / 103° 42.437’E
F 1° 16.922’N / 103° 42.393’E
G 1° 16.752’N / 103° 42.495’E
H 1° 16.682’N / 103° 42.662’E
I 1° 16.665’N / 103° 42.607’E
J 1° 16.636’N / 103° 42.565’E
K 1° 16.587’N / 103° 42.540’E
L 1° 16.535’N / 103° 42.524’E
M 1° 16.561’N / 103° 42.439’E
N 1° 16.676’N / 103° 42.475’E
O 1° 16.743’N / 103° 42.409’E
P 1° 16.673’N / 103° 42.327’E
Q 1° 16.881’N / 103° 42.215’E
R 1° 17.108’N / 103° 42.058’E
S 1° 17.117’N / 103° 42.071’E
T 1° 17.186’N / 103° 42.031’E
U 1° 17.272’N / 103° 41.999’E
The reclamation works will involve removal of existing rocks from the rock
keys along the existing shoreline and stockpiling at designated re-handling
area at Ayer Chawan Basin. Shore protection works will be carried out by
crane barges.
Craft involved in the works will exhibit the appropriate local and
international day and night signals.
When in the vicinity of the working area, mariners are reminded to:
(a) Keep well clear and not to enter the working area;
(b) Maintain a proper lookout;
(c) Proceed at a safe speed and navigate with caution;
(d) Maintain a listening watch on VHF Channel 22 (Jurong Control);
and
(e) Communicate with Jurong Control on VHF hannel 22 for assistance, if
required.
For information about operations in Singapore contact GAC Singapore at
singapore@gac.com
DATE: June 13, 2013
COUNTRY: Australia
PORT: Port Hedland
New Port Improvement Rate to be introduced
Port Hedland will introduce a new fee – the Port Improvement Rate (PIR) –
on 1 September 2013.
The PIR is for funding Capital Improvements at the port. At present this
fee is expected to be in place for 5 years subject to consultations for
renewal.
The proposed schedule of rates is as below:
Charge per vessel movement (in AUD)
GRT <10825
– 2013/2014: $660
– 2014/2015: $660
– 2015/2016: $660
– 2016/2017: $660
– 2017/2018: $660
GRT 10825–19999
– 2013/2014: $1, 400
– 2014/2015: $1, 400
– 2015/2016: $1, 400
– 2016/2017: $1, 400
– 2017/2018: $1, 400
GRT 20000–39999
– 2013/2014: $2, 600
– 2014/2015: $2, 600
– 2015/2016: $2, 600
– 2016/2017: $2, 600
– 2017/2018: $2, 600
GRT 40000–59999
– 2013/2014: $5, 400
– 2014/2015: $5, 400
– 2015/2016: $5, 400
– 2016/2017: $5, 400
– 2017/2018: $5, 400
GRT 60000–79999
– 2013/2014: $6, 500
– 2014/2015: $6, 500
– 2015/2016: $6, 500
– 2016/2017: $6, 500
– 2017/2018: $6, 500
GRT 80000+
– 2013/2014: $10, 200
– 2014/2015: $10, 200
– 2015/2016: $10, 200
– 2016/2017: $10, 200
– 2017/2018: $10, 200
The rate above will be charged on each inbound, and each outbound vessel
movement
For information about operations in Australia contact GAC Australia at
shipping.australia@gac.com
DATE: June 13, 2013
Bunker Update:
MARKET PRICE UPDATE 13/06/13
—————
GAC Bunker Fuels Ltd Pricing Alert
MARKET PRICE UPDATE 13/06/13
180 CST 380 CST MGO MDO
- Aberdeen 0 0 906.00 0
- Aden 745.00 0 1, 110.00 0
- Alexandria 710.00 670.00 1, 170.00 0
- Amsterdam 601.00 577.00 843.00 0
- Antwerp 612.00 585.00 857.00 0
- Aqaba 0 720.00 1, 040.00 0
- Bahrain 0 0 1, 025.00 0
- Bergen 695.00 672.00 920.00 0
- Busan 651.00 630.00 895.00 885.00
- Cape Town 696.00 0 968.00 0
- Colombo 672.00 665.00 1, 070.00 0
- Dubai 655.00 640.00 820.00 0
- Durban 665.00 0 1, 085.00 0
- Falmouth 0 605.00 970.00 0
- Fujairah 670.00 621.50 1, 010.00 0
- Gibraltar 687.50 655.50 922.50 0
- Hong Kong 649.00 628.50 915.00 0
- Houston 664.00 577.00 945.00 0
- Istanbul 669.50 641.50 950.50 0
- Jeddah 700.00 660.00 1, 080.00 0
- Kaohsiung 659.00 629.00 962.00 947.00
- Kuwait 651.00 621.00 1, 009.00 0
- Leith 0 0 940.00 0
- Lerwick 0 0 916.00 0
- Malta 706.50 681.50 902.50 0
- Mumbai 653.50 620.50 1, 057.50 0
- New York & New Jersey 620.00 585.00 945.00 0
- Panama 660.00 595.00 995.00 0
- Piraeus 701.50 676.50 907.50 0
- Port Louis 0 0 1, 033.00 0
- Port Said 710.00 655.00 1, 090.00 0
- Qatar 0 0 900.00 0
- Richards Bay 675.00 0 1, 095.00 0
- Rio de Janeiro 648.50 625.00 940.00 0
- Rotterdam 609.00 585.00 851.00 0
- Salalah 710.00 660.00 1, 110.00 0
- Shanghai 672.00 643.00 1, 076.50 0
- Sharjah 655.00 640.00 820.00 0
- Singapore 615.00 605.00 881.00 0
- St Petersburg 587.50 568.50 0 0
- Stavanger 0 0 917.00 0
- Suez 685.00 650.00 1, 075.00 0
- Walvis Bay 660.00 0 960.00 0
- West Africa OFFSHORE – FROM ABIDJAN TO LUANDA 0 685.00 950.00 0
Present in seven locations worldwide, GAC Bunker Fuels, part of the GAC
group, is a global broker and trader of marine fuels and lubricants.
The prices listed are for indication purposes only, and local offices should be
approached directly for firm prices.
Middle East & Africa:
bunker.ae@gac.com
Europe: bunker.gb@gac.com
Egypt & Mediterranean: bunker.eg@gac.com
Americas:bunker.us@gac.com
Asia Pacific: bunker.sg@gac.com
Indian nSubcontinent: bunker.sl@gac.com
Contact Martyn McMahon on +971 566032534 or Martyn.mcmahon@gac.com quoting HPN for more information or with your bunker enquiry.



