Revised maximum draft at SBM 17 Dec 2025, Port Dickinson, Malaysia The maximum draft for vessels calling Hengyuan Refining Company Berhad Port Dickson SBM has been revised to 15. 80 metres. READ MORE
Rectification of floating sea barrier at Sentosa Cove 17 Dec 2025, Singapore From 17 December 2025 to 17 April 2026, rectification works are being conducted at a floating sea barrier at Sentosa Cove. READ MORE
Installation of temporary mooring buoy system 17 Dec 2025, Singapore Work is underway until 9 June 2026 to install a temporary mooring buoy system for Vopak Sebarok Jetty 10. READ MORE