| LOADING ARM MAINTENANCE AT GAS JETTY United Kingdom, Immingham |
SHIP TO SHIP OPERATIONS & BOAT SERVICES TO RESUME Oman, Salalah Port |
||
| REPAIRS AND CONSTRUCTION AT SENTOSA COVE Singapore, Singapore |
| Loading arm maintenance at gas jetty | ||
| September 18, 2014, United Kingdom, Immingham | ||
| From 0800 hours on 25 September to 1800 hours on 26 September, Immingham Gas Jetty (IGJ) will not be available for any shipping, due to loading arm maintenance.
For information about operations in the UK contact GAC UK at uk@gac.com |
![]() |
| Ship to ship operations & boat services to resume | ||
| September 18, 2014, Oman, Salalah Port | ||
| Ship to ship operations and boat services to anchorage [at the Port of Salalah] will be resumed with effect from 0000 Hrs on 20 September 2014.
(For information about operations at Salalah contact GAC Oman at salalah@gac.com) Source: Port of Salalah Marine Notice No.06/2014 dated 18 September 2014 |
![]() |
| Repairs and construction at Sentosa Cove | ||
| September 18, 2014, Singapore, Singapore | ||
| Waterfront From 20 September 2014 to 10 January 2015, repair and construction works will be carried out at Sentosa Cove Waterfront.
According to the Maritime and Port Authority of Singapore’s Port Marine Notice No.120 of 2014 dated 18 September, the works will be conducted 24 hours daily – including Sundays & Public Holidays – within the two working area bounded by the following co-ordinates (WGS 84 Datum):
WORKING AREA 1 1) 1° 14.344’N / 103° 50.186’E 2) 1° 14.326’N / 103° 50.198’E 3) 1° 14.380’N / 103° 50.223’E 4) 1° 14.379’N / 103° 50.209’E
WORKING AREA 2 6) 1° 14.613’N / 103° 50.477’E 7) 1° 14.608’N / 103° 50.498’E 8) 1° 14.692’N / 103° 50.518’E 9) 1° 14.697’N / 103° 50.497’E
Repair and construction works will entail removal of existing pontoon and installation of new pontoon with gangway.
Craft involved in the works will exhibit the appropriate local and international day and night signals.
When in the vicinity of the working area, mariners are reminded to: (a) keep well clear and not to enter the working area; (b) maintain a proper lookout; (c) proceed at a safe speed & navigate with caution; (d) maintain a listening watch on VHF channel 68; and (e) communicate with West Control on VHF 68 for assistance, if required.
For information about operations in Singapore contact GAC Singapore at singapore@gac.com |






